Respuesta :
The total labor cost of variance is the difference of the two presented costs. The actual cost of production is presented below,
actual cost of production = $198,000
The other cost can be calculated through the equation,
cost of production = (3 hours/labor u)(($8/unit)(8,000) = $192,000
Thus, the total labor cost variance is approximately $6,000.
actual cost of production = $198,000
The other cost can be calculated through the equation,
cost of production = (3 hours/labor u)(($8/unit)(8,000) = $192,000
Thus, the total labor cost variance is approximately $6,000.
Answer:
$6000 unfavorable.
Explanation:
Given information:
Time = 3 hours
Cost of labor = $8.00
Number of units = 8,000
Total actual labor cost = $198,000.
Standard labor cost = 8,000 × 3 × $8.00 = $192,000
Total labor cost variance = Standard labor cost - Actual labor cost
Total labor cost variance = $192,000 - $198,000
Total labor cost variance = -$6,000
Here negative sign represents the unfavorable amount.
The total labor cost variance is $6000 unfavorable.