Airlines monitor the causes of flights arriving late. A total of 75% of flights are late because of weather, while 35% of flights are late because of ground operations. A full 10% of flights are late because of weather and ground operations. What is the joint probability that a flight arrives late because of weather and ground operations

Respuesta :

Answer:

36% is the  joint probability that a flight arrives late because of weather and ground operations

Step-by-step explanation:

Given

% of flight late because of weather = 0.75

% of flight late because of ground operation = 0.35

% of flight late because of both weather and ground operation = 0.10

The probability of joint probability that a flight arrives late because of weather and ground operations is equal to

p (A and B) + {P(A) * P(B)}

0.10 + (0.75 * 0.35)

0.36

or 36%