Answer:
Step-by-step explanation A construction crew is lengthening a road. Let L be the total length of the road (in miles). Let D be the number of days the crew has worked. Suppose that =L+4D200 gives L as a function of D . The crew can work for at most 70 days. =L+4D200 is not clear, not an equation.on: