Answer:
6.79
Step-by-step explanation:
-Let X denote the total amount of the job.
-The job has to be done in 5 hrs, therefore the portion done every hour is:
[tex]Rate=\frac{Total}{Time}\\\\=\frac{X}{5}\\\\=\frac{1}{5}X=0.2X[/tex]
Therefore, the rate of Bill and Ted working jointly must equal the rate calculated above:
[tex]R_{Bill}=\frac{X}{19}\\\\=\frac{1}{19}X\\\\R_{Bill}+R_{Ted}=R_{required}\\\\\frac{1}{19}X+R_{Ted}=\frac{1}{5}X\\\\R_{Ted}=\frac{1}{5}X-\frac{1}{19}X\\\\=\frac{14}{95}X\\\\\therefore \frac{14}{95}X=1\ hr\\\\X=1\div \frac{14}{95}\\\\=6.7857\approx 6.79[/tex][tex]hrs[/tex]
Hence, Bill working alone should complete the house in 6.79 hrs