Answer:
Eco Fabrics
Wool Cotton Total
Cutting 180,000 180,000 360,000
Design (585,000/1500)*1000
390,000 195,000 585,000
Total 570,000 375,000 945,000
Overhead Rate = Total Overhead Costs/ Direct Labor Hours= 945,000/ 450,000= 2.1
Overhead Rate for Wool = 570,000/225,000= 2.533
Overhead Rate for Cotton = 375,000/225,000= 1.667
Working:
Cutting Design
(cost driver is machine hours) (cost driver is number of setups)
Overhead $360,000 $585,000
Wool Cotton Total
Machine hours 100,000 100,000 200,000
Number of setups 1,000 500 1,500