Answer:
Number of vats used is 3
Explanation:
Number of pounds used per hour, D = 195 ÷ 8
= 24.375 pounds per hour
Cycle time, T = 2.25
Inefficiency factor, e = 0.19
Material held in vats, C = 25 pounds
Now,
Let, n be total number of vats
Thus,
n = [tex]\frac{DT(1+e)}{C}[/tex]
on substituting the respective values, we get
n =[tex]\frac{25.75\times2.25\times(1+0.10)}{25}[/tex]
or
n = 2.413 ≈ 3
Number of vats used is 3 [since vats cannot be in fraction]